Diving team at Montgomery Locks and Dam
On a cold and snowy day in February, members of the district's dive team conducted operations to inspect and measure the lower sill of the 600-foot chamber at Montgomery Locks and Dam on the Ohio River. The measurements were requested by the Inland Navigation Design Center to assist them in the final design for the new bulkhead sill system. The new sill system is expected to be installed during fiscal year 2018. The team completed the mission in half the time and without incident.