PAO
PITTSBURGH – After days of heavy rain and storms in the area, the sun shined brightly on the ribbon cutting, or more correctly stated, valve-turning ceremony for the completion of the Sheraden Park Aquatic Ecosystem Restoration Project, June 1.

Download Image: Full Size (0.2 MB)
Tags:
Photo by: Carol Vernon |  VIRIN: 190606-A-CE999-989.JPG