Document Types

FONSI = Finding of No Significant Impact
EA = Environmental Assessment

NOP = Notice of Preparation
EIS = Environmental Impact Statement
SOF = Statement of Findings

ROD = Record of Decision

MP = Master Plan

Current Environmental Documents

Click any column header to sort table data.
DateBasinProject NameLinkType
  Blacklick Valley Municipal Authority Wastewater Section 313https://www.lrp.usace.army.mil/Portals/72/DRAFT%20EA%20and%20FONSI%20Blacklick%20Valley%20Municipal%20Authority%20July2019.pdfEA
  FINAL FONSI National Pike Water Authority Section 313https://www.lrp.usace.army.mil/Portals/72/FINAL%20FONSI%20NPWA%20Water%20Storage%20Tank_27NOV2018.pdfFONSI
  DRAFT EA and FONSI New Waterford Section 594https://www.lrp.usace.army.mil/Portals/72/DRAFT%20EA%20and%20FONSI%20New%20Waterford%20Water%20Line%20Replacement_Dec2018.pdfEA, FONSI
  FINAL EA and FONSI for Sullivan Run LPP PL 84-99 Emergency Repair Projecthttps://www.lrp.usace.army.mil/Portals/72/000101-A-FL475-044%20sized.jpgEA, FONSI
  FINAL EA and FONSI for Section 408 Request to Alter the Dubois LPPhttps://www.lrp.usace.army.mil/Portals/72/docs/ProjectReviewPlans/FINAL%20EA%20and%20FONSI%20Dubois%20Section%20408%20Request.pdfEA, FONSI
  FINAL EA and FONSI for the PennDOT Section 408 Request to alter the Johnstown LPPhttps://www.lrp.usace.army.mil/Portals/72/docs/FONSI/FINAL%20EA%20and%20FONSI%20Johnstown%20Moxham%20Bridge.pdfEA, FONSI
  FINAL EA and FONSI for the PennDOT Section 408 Request to Alter the Brookville LPPhttps://www.lrp.usace.army.mil/Portals/72/docs/FONSI/FINAL%20EA%20and%20FONSI%20Brookville%20PennDOT%20bridge%20June2018.pdfEA, FONSI
  DRAFT EA and FONSI for the Section 408 Request to Alter Dubois LPPhttps://www.lrp.usace.army.mil/Portals/72/docs/FONSI/DRAFT%20EA%20and%20FONSI%20Dubois%20LPP%20Sidewalk.pdfEA, FONSI
  DRAFT EA and FONSI for the PennDOT Section 408 Request to Alter the Johnstown LPPhttps://www.lrp.usace.army.mil/Portals/72/docs/DRAFT%20EA%20and%20FONSI_408_Johnstown%20LPP.PDFEA, FONSI
  DRAFT Environmental Assessment and FONSI for the Berlin Lake Deviation Requesthttps://www.lrp.usace.army.mil/Portals/72/DRAFT%20EA%20and%20FONSI%20Berlin%20Lake%20Deviation.pdfEA, FONSI
  FINAL EA and FONSI for the PennDOT Section 408 Request to Alter Big Run LPPhttps://www.lrp.usace.army.mil/Portals/72/docs/regulatory/FINAL%20EA%20and%20FONSI%20Big%20Run%20408.pdfEA, FONSI
  DRAFT EA and FONSI for the PennDOT Section 408 Request to Alter the Brookville LPPhttps://www.lrp.usace.army.mil/Portals/72/DRAFT%20EA%20and%20FONSI%20PennDOT%20bridge%20Brookville.pdfEA, FONSI
  DRAFT EA and FONSI for the Penelec Section 408 Request to Alter the Big Run LPPhttps://www.lrp.usace.army.mil/Portals/72/docs/ProjectReviewPlans/Draft%20EA%20and%20FONSI%20Big%20Run%20Utility%20Line%20PN.PDFEA, FONSI
  DRAFT EA for Section 408 Request to Alter the Big Run LPPhttps://www.lrp.usace.army.mil/Portals/72/DRAFT%20EA%20and%20FONSI_408_Big%20Run%20LPP_31Jan2018.pdfEA
  DRAFT Environmental Assessment for the Section 408 Request to ALter Olean LPPhttps://www.lrp.usace.army.mil/Portals/72/Draft%20EA%20and%20FONSI%20Olean%20LPP%20408%20_20170807.pdfEA
  DRAFT EA for the Section 408 Request to Alter the Brookville LPPhttps://www.lrp.usace.army.mil/Portals/72/docs/FONSI/Draft%20EA%20&%20FONSI%20Brookville%20408_20170606.pdfEA
  DRAFT FONSI Stonewall Jackson Resort Exspansion Projecthttps://www.lrp.usace.army.mil/Portals/72/DRAFT%20FINDING%20OF%20NO%20SIGNIFICANT%20IMPACT.pdfFONSI
  DRAFT FONSI Speedway Sanitary Force Main Installation Projecthttps://www.lrp.usace.army.mil/Portals/72/docs/Speedway%20DRAFT%20FONSI%20dc%20comments.pdfFONSI
  DRAFT FONSI Released for P.L. 84-88 Ridgeway LPPhttps://www.lrp.usace.army.mil/Portals/72/docs/HotProjects/Ridgway%20Draft%20FONSI.pdfFONSI
  East Branch Dam Repairhttp://www.lrp.usace.army.mil/Missions/Planning-Programs-Project-Management/Key-Projects/East-Branch-Dam-Repair/ 
  Shallow Land Disposal Areahttp://www.lrp.usace.army.mil/Missions/Planning-Programs-Project-Management/Key-Projects/Shallow-Land-Disposal-Area/ 
  Water Control Manualshttp://www.lrp.usace.army.mil/Missions/Planning-Programs-Project-Management/Key-Projects/Water-Control-Manuals/ 
  Lower Mon Projecthttp://www.lrp.usace.army.mil/Missions/Planning-Programs-Project-Management/Key-Projects/Lower-Mon-Project/ 
  Mon River Watershed Assessmenthttp://www.lrp.usace.army.mil/Missions/Planning-Programs-Project-Management/Key-Projects/Monongahela-River-Watershed-Assessment/ 
  Upper Ohio Navigation Studyhttp://www.lrp.usace.army.mil/Missions/Planning-Programs-Project-Management/Key-Projects/Upper-Ohio-Navigation-Study/ 
  Emsworth Locks and Dam Rehabhttp://www.lrp.usace.army.mil/Missions/Planning-Programs-Project-Management/Key-Projects/Emsworth-Locks-Dams-Major-Rehabilitation-Project/ 
  Shoreline Management http://www.lrp.usace.army.mil/Missions/Planning-Programs-Project-Management/Key-Projects/Shoreline-Management-Program/ 
  Ohio River Basin Comprehensive Recon Studyhttp://140.194.46.43/OhioRiver/text/pitrpt.txt 
  DRAFT EA and FONSI for Johnstown Redevelopment Authority / City of Johnstown Section 313https://www.lrp.usace.army.mil/Portals/72/JohnstownDRAFTEA.PDFEA, FONSI
  DRAFT EA and FONSI for Amsterdam Section 594https://www.lrp.usace.army.mil/Portals/72/docs/regulatory/2019%20Public%20Notices/New%20Amsterdam%20PN_13May2019.pdfEA, FONSI
  DRAFT EA and FONSI SUllivan Run LPP PL 84-99 Emergency Repair Projecthttps://www.lrp.usace.army.mil/Portals/72/docs/HotProjects/Draft%20EA%20and%20FONSI%20Sullivan%20Run%20LPP.PDFEA, FONSI
  DRAFT EA and FONSI National Pike Water Authority Section 313https://www.lrp.usace.army.mil/Portals/72/docs/regulatory/FOIA/DRAFT%20EA%20and%20FONSI%20National%20Pike%20Water%20Authority%20Section%20313.pdfEA, FONSI
4/2/2020 Final EA and FONSI for the Seneca Nation Section 1135 Ecosystem RestorationFinal EA and FONSI for the Seneca Nation Section 1135 Ecosystem Restoration.pdf 
8/18/2020 DRAFT EA and FONSI for North Union Township Municipal Services Authority Section 313DRAFT_EA_FONSI_N_Union_Section_313.pdf 
8/10/2022Ohio River Sustainable Rivers Program: Ohio River Systems AnalysisFINAL-SRP Ohio River Study Report-DQC.pdf 
3/29/2023Upper Ohio RiverOpen-Water Site Selection for Dredged Material Upper Ohio Navigation Project - Emsworth, Dashields and Montgomery Locks and Dams, Pennsylvaniahttps://usace.contentdm.oclc.org/utils/getfile/collection/p16021coll7/id/23409Scoping Information