Notice No. |
Date Issued |
Description |
| 12-20 |
May 20, 2012 |
Locks and Dam 4, Monongahela River, Mile 41.5; Installation of Panels for New River Guard Wall |
| REVISED 12-14 |
May 9, 2012 |
Installation of Flashboards, Lock & Dam 9, Allegheny River, Mile 62.2 |
| 12-19 |
May 8, 2012 |
Offloading Equipment from Barge, Ohio River, Mile 118.6, Left Bank, Marshall County, WV |
| 12-18 |
May 3, 2012 |
Installation of Pipeline Crossing, Monongahela River, Mile 118.0 |
| 12-17 |
May 2, 2012 |
Emsworth Locks and Dams, Ohio River, Mile 6.2, Intermittent closures of 56' x 360' River Lock Chamber |
| 12-16 |
May 2, 2012 |
Dashields Locks and Dam, Ohio River, Mile 13.3, Closure of the 110' x 600' Land Lock Chamber |
| 12-15 |
April 24, 2012 |
Overhead Transmission Line Replacement, Allegheny River, Mile 23.8 |
| REVISED 12-12 |
April 26, 2012 |
Installation of Pipeline Crossing, Youghiogheny River, Mile 17.1 |
| 12-14 |
April 18, 2012 |
Installation of Flashboards, Lock & Dam 9, Allegheny River, Mile 62.2 |
| REVISED 12-04 |
April 12, 2012 |
New Cumberland L/D, Ohio River, Mile 54.3, Installation of Floating Mooring Bitts |
| 12-13 |
April 11, 2012 |
Lock 2, Allegheny River, Mile 6.7, Intermittent Closures of the Single, 56' x 360' Lock Chamber |
| 12-12 |
April 3, 2012 |
Installation of Pipeline Crossing, Youghiogheny River, River Mile 17.1 |
| 12-11 |
March 23, 2012 |
Exploratory Drilling; Ohio River, Center Channel, Mile 29.7 |
| 12-10 |
March 14, 2012 |
Dam Warning Buoys, Allegheny, Monongahela and Ohio Rivers |
| 12-09 |
March 12, 2012 |
Lock and Dam 4 (Charleroi), Monongahela River, Mile 41.5; 19-day closure of single lock chamber |
| 12-08 |
March 6, 2012 |
Schedule of Operations for 2012 Monongahela River Locks |
| 12-07 |
March 6, 2012 |
Pennsylvania Turnpike, Mon-Fayette Expressway, Uniontown to Brownsville Section 51H Construction Project; Monongahela River, Left Bank, Mile 59.11 and Right Bank Mile 59.13 |
| 12-06 |
March 1, 2012 |
Dashields L/D, Ohio River, Mile 13.3; Access Road Closed |
| 12-05 |
March 1, 2012 |
Schedule of Operations for 2012 Allegheny River Locks |
| 12-04 |
February 24, 2012 |
New Cumberland L/D, Ohio River, Mile 54.3; Installation of Floating Mooring Bitts |
| 12-03 |
February 21, 2012 |
New Cumberland L/D, Ohio River, Mile 54.3; Intermittent Closures of the 110' x 1200' River Lock Chamber |
| 12-01 |
February 14, 2012 |
Causeway construction associated with the Masontown Bridge Replacement; Monongahela River, Left Descending Bank, Mile 79.15 |
| 12-02 |
February 13, 2012 |
Removal of two sunken coal barges; Monongahela River, Left Bank, Mile 92.1 |
| 11-29 – REVISION #3 |
January 25, 2012 |
Installation of Pipeline Crossing Monongahela River, Mile 34.6 |
| 11-42 |
December 22, 2011 |
Removal of Fort Steuben Bridge; Ohio River, Main Channel, Mile 66.3 |
| 11-29 REVISED#2 |
December 6, 2011 |
Installation of Pipeline Crossing; Monongahela River, Mile 34.6 |
| 11-41 |
December 6, 2011 |
Lock 4, Allegheny River, Mile 24.2; Repairs to the downstream miter gates |
| 11-39 REVISED |
November 29, 2011 |
L/D 3, Monongahela River, Mile 23.8; Land Chamber and River Chamber Shutdowns to Replace Hydraulic Pipe |
| 11-34 REVISED |
November 28, 2011 |
Seasonal Lock Closings and Schedule of Operations for Allegheny River Locks |
| 11-29 Revised |
November 2, 2011 |
Installation of Pipeline Crossing; Monongahela River, Mile 34.6 |
| 11-40 |
October 27, 2011 |
Glenwillard Boat Club, Rowing Races; Ohio River, Mile 14.1 to 16.8 |
| 11-39 |
October 28, 2011 |
L/D 3, Monongahela River, Mile 23.8; Land Chamber and River Chamber Shutdowns to Replace Hydraulic Pipe |
| 11-38 REVISED |
October 24, 2011 |
Pipe Insulation Work on the Union Railroad Bridge at Monongahela River, Mile 9.2 |
| 11-38 |
October 21, 2011 |
Pipe Insulation Work on Port Perry Bridge at Monongahela River, Mile 9.2 |
| 11-37 |
October 14, 2011 |
Removal of Small Boat Warning Signs and Buoys; Allegheny, Monongahela, and Ohio Rivers |
| 11-36 |
October 5, 2011 |
Underwater Pipeline Crossing Inspections, Ohio River and Monaca, PA to Neville Island, PA |
| 11-35 |
October 1, 2011 |
Seasonal Lock Closings and Schedule of Operations for Monongahela River Locks |
| 11-34 |
October 1, 2011 |
Seasonal Lock Closings and Schedule of Operations for Allegheny River Locks |
| 11-33 |
September 26, 2011 |
Repair and Installation of Cells; Ohio River; Mile 46.8 |
| 11-32 |
September 26, 2011 |
Montgomery L/D, Ohio River, Mile 31.7, 24-hour closure of 110' x 600' Lock Chamber |
| 11-31 |
September 21, 2011 |
Replacement of Overhead Shield Wire, Monongahela River, Mile 12.2 |
| 11-30 |
September 1, 2011 |
Maxwell L/D, Monongahela River, Mile 61.2; Intermittent Lock Closures for Emergency Repairs |
| 11-29 |
September 1, 2011 |
Installation of Pipeline Crossing, Monongahela River, Mile 34.6 |
| 11-28 |
August 31, 2011 |
Demolition of the State Route 88 Bridge over Ten Mile Creek, Main Channel, Mile 0.6 |
| 11-27 |
August 26, 2011 |
6, Allegheny River, Mile 36.3 Lock Chamber Closed until September 2 |
| 11-26 |
August 23, 2011 |
Underwater Diving Operation, Follansbee Plant, Ohio River, Mile 69.7 |
| 11-25 |
August 12, 2011 |
New Cumberland L/D, Ohio River, Mile 54.4; 24-Hour Closure of the Large 110' x 1200' Lock Chamber to Repair Miter Gate Operating Machinery |
| 11-24 |
August 8, 2011 |
Grays Landing L/D, Monongahela River, Mile 82.0, 11-Day Closure of the Single, 84' x 720' Lock Chamber |
| 11-23 |
August 8, 2011 |
Install Electric Pumps at Lock 6, Allegheny River and Lock 7, Allegheny River |
| 11-22 |
July 29, 2011 |
Demolition of Bridgeport Highway Bridge, Ohio River back channel mile 90.2, Wheeling, WV |
| 11-21 |
July 25, 2011 |
Maxwell L/D, Monongahela River, Mile 61.2, 12-Hour Closure for Emergency Hydraulic Repair |
| 11-20 |
July 15, 2011 |
Pennsylvania Turnpike, Mon-Fayette Expressway Uniontown to Brownsville Section 51-H Construction Project Monongahela River, Left Bank, Mile 59.11 and Right Bank, Mile 59.13 |
| 11-19 |
July 13, 2011 |
Installation of Multi-Port Diffuser, Ohio River, Left Bank, Mile 93.5 |
| 11-18 |
July 5, 2011 |
Demolition of Span 6 & 7 of the Charleroi-Monessen Bridge, Monongahela River, Main Channel, Mile 41.03 |
| 11-17 |
June 1, 2011 |
Bruno Island Bridge Maintenance, Ohio River, Mile 2.2, Main Channel and Back Channel |
| 11-16 |
May 26, 2011 |
Dashields Locks and Dam Ohio River, Mile 13.3; Dewater 56' x 360' Auxiliary Lock and Install Lock, Dam, and Waterway Signs |
| 11-15 |
May 19, 2011 |
Installation of Flashboards, Lock & Dam 9, Allegheny River, Mile 62.2 |
| 11-14 |
May 11, 2011 |
Wierton-Mahans Lane-Tidd 138 kV Aerial Power Transmission Line Replacement Crossing of Ohio River, Mile 70 |
| 11-13 |
May 10, 2011 |
Braddock Locks and Dam, Monongahela River, Mile 11.3; Replace Middle Wall Emptying Valve, Renovate Operating Machinery, and Install Intake Screens |
| 11-12 |
May 3, 2011 |
Removal of Pier 5, Allegheny River Bridge, Back Channel, Allegheny River, Right Bank, mile 14.0 |
| 11-11 |
April 19, 2011 |
Maxwell L/D, Monongahela River, 5-Day Closure of the River Lock Chamber |
| 11-10 Revised |
May 26, 2011 |
Revised - Dam Warning Buoys for Allegheny, Monongahela, and Ohio Rivers |
| 11-09 |
April 8, 2011 |
Status of Pittsburgh District Locks and Dams During Possible Government-Wide Shutdown |
|
11-08 Revised |
May 25, 2011 |
Revised - Scheduled Reopening Date is 1 a.m. June 2, 2011 --
C. W. Bill Young L/D, Allegheny River, Mile 14.5 26-Day Closure of the
Single, 56' x 360' Lock Chamber Dewater Lock Chamber to Repair/Inspect Miter
Sills and Miscellaneous Machinery Repairs |
|
11-07 |
March 28, 2011 |
Dashields Locks and Dam, Ohio River, Mile 13.3; Closure of the 56 ft x 360 ft Lock Chamber April 25-26 |
|
11-06 |
March 25, 2011 |
Intake Inspection and Repairs; Monongahela River, Right Bank, Mile 78.1 |
|
11-05 |
March 25, 2011 |
Hulton Road Bridge test Borings; Allegheny River, Mile 12.7 |
|
11-04 |
March 7, 2011 |
Schedule of Operations for 2011 Allegheny River Locks |
|
11-03 |
March 7, 2011 |
Schedule of Operations for 2011 Monongahela River Locks |
|
11-02 |
February 18, 2010 |
New Cumberland L/D, Ohio River, Mile 54.4
Renovate River Wall Filling Valve, Middle Wall Filling Valve, and Operating Machinery in the
Large 110' x 1200' Lock Chamber |
|
11-01 |
February 14, 2010 |
New tow haulage system for the land lock chamber at Braddock Locks and Dam, Monongahela River, Mile 11.3, is operational. |
|
10-24 |
August 11, 2010 |
Caution near the FirstEnergy (Ohio Edison) Sammis Plant Water
Intake at Ohio River, Mile 53.8 |
7-20 |
July 3, 2007 |
Lock and Dam 4, Allegheny River, Mile 24.2 - Special Draft Limitations During Low Water |
07-19 |
July 3, 2007 |
Lock and Dam 4,
Monongahela River, Mile 41.5
Special Draft Limitations
During Low Water |
04-49 |
October 4, 2004 |
L/D 4,
Monongahela River, Mile 41.5, Mooring of Vessels on the Land Wall |
04-38 |
July 19, 2004 |
Availability of
Navigation Charts |
04-26 |
May 11, 2004 |
Principal Data Sheet - Navigation Locks and Dams for the Pittsburgh District |
04-25 |
May 11, 2004 |
L/D 2, Monongahela River, Mile 11.2, New Interim Normal Upper Pool |
04-16 |
March 30, 2004 |
L/D 4, Monongahela River, Mile 41.5, Permanent Closure of River Lock Chamber
and 24-Hour Closures of Land Lock Chamber |
02-32 |
June 26, 2002 |
Pike Island
Locks and Dam, Ohio River Damaged Mooring Cell at Ohio River Mile 83.2 |