Corps set to replace failing dam gates
An in-depth 2006 structural analysis of the dam concluded that all 10 of the dam’s gates were in an active state of failure under normal hydraulic load. To date, the Pittsburgh District has replaced four of the 10 gates. The fifth gate is currently being replaced under a separate contract.